How a project comes together, stage by stage

Every stage in the order a building is actually built: structure first, then services, finishes and handover.

4 photos
01

Excavation & foundations

Setting out from the survey, excavation to design level and blinding concrete, then footings, neck columns and tie beams with anti-termite treatment and backfilling.

2 photos
02

Reinforcement & formwork

Steel fixed to the structural drawings with the right cover and spacing, formwork aligned and braced, and everything inspected by the consultant before each pour.

4 photos
03

Concrete & structural frame

Ready-mix concrete placed by pump and vibrated, with cube tests and curing, building the columns, beams and slabs floor by floor.

3 photos
04

Blockwork

External and internal walls built true to line and level, with lintels and openings set out to the architectural drawings.

1 photo
05

Electrical, plumbing & drainage

Conduits, water pipes and drainage lines installed and pressure-tested before walls and floors are closed.

1 photo
06

Plastering

Internal and external plaster applied over mesh and corner beads, kept plumb and level for tiles and paint.

1 photo
07

Roof waterproofing

Membrane waterproofing and thermal insulation with sealed upstands, flood-tested before the roof is tiled.

5 photos
08

External facades

Stone cladding, external paint systems and facade details finished to the approved samples.

4 photos
09

Gypsum ceilings & A/C coordination

Ceiling frames set around A/C ducts, lighting and access panels, coordinated with the A/C contractor before boarding.

3 photos
10

Tiling, marble & painting

Porcelain and marble laid to level with aligned joints, followed by putty, primer and the final paint coats.

1 photo
11

Aluminium & glazing

Windows, doors and glazed facades installed and sealed to the approved shop drawings.

2 photos
12

External works & interlock

Interlock, paving, boundary-wall finishes and external drainage around the building.

1 photo
13

Sanitary & electrical fittings

Sanitary ware, vanities, switches, sockets and distribution boards fitted, then tested circuit by circuit.

3 photos
14

Doors, wardrobes & kitchens

Wooden doors, built-in wardrobes and kitchen units installed and adjusted to a clean finish.

7 photos
15

Testing, snagging & handover

Final testing, snag rectification and cleaning, then the completion certificate and handover documents.